- DESIGN STANDARDS
RCC framed structures to withstand wind and seismic loads to comply with NBC and standards with flat slabs with longer spans.
Floor Loading : 500 kg/sq.m with designated areas strengthening to 700 kg/sq.m,
Floor to Floor Height : Podium area (Ground & First Floors) – 4.5 m and Towers (2nd to 12th Floors) – 3.75 m
Basement Floor Height : 4.5m each floor with multi-level parking provision
Super Structure : Solid cement blocks / Red Brick masonry of 4” / 6” / 9” walls as per architectural drawings
- FLOORING
Staircases: Granite slabs / Kota flooring
Entrances & Lobby areas : Italian Marble & Ethnic Granite
Podium Area Flooring : Vitrified tiles with required appropriate sizes
Parking Area : Combination of VDF, Cement based tiles over PCC bed and all round area with
cobbler stone or high density interlocking designed pavements. Granite slabs / Kota flooring
Entrances & Lobby areas : Italian Marble & Ethnic Granite
Podium Area Flooring : Vitrified tiles with required appropriate sizes
Parking Area : Combination of VDF, Cement based tiles over PCC bed and all round area with cobbler stone or high density interlocking designed pavements.
- FACADE
Building façade shall be combination of double-glazing, Aluminum composite panels, and stone cladding and masonry with plastering and texture paint
- WATER SUPPLY
Drilled Borewells, which yield sufficient water to cater the needs of the all the commercial and offices Overhead Tanks / Ground sumps with sufficient capacity with motors for pumping for 24 hrs water supply
- SEWERAGE SYSTEM
The development shall have an underground STP and the treated water shall be used for cooling, landscaping and
flushing purposes
- PAINTING
All the open areas shall be painted with weather proof exterior paint with texture finishes wherever required as per elevation
All internal areas wherever required shall be Birla Putty finish with emulsion paint Parking areas common areas shall be painted with cement based paint
- H.V.A.C
The development is designed to have centralized air conditioning system through combination of air/water-cooled chillers designed to provide an ambient temp of 22 degrees C +/- 2 degrees
- ELEVATORS
The development shall have Speed Elevators service lifts & passenger lifts to all the floors for the free movement of people as per the estimated footfall capacity standards.
All the sides of the lifts to be dado with granite or italian marble aesthetically.
- POWER SUPPLY & BACKUP
The development shall be done as per IS standards making the required provisions to all the shopping/commercial/office outlets with required capacity of power supply DG set with 100% generator power back up for total building
- FIRE FIGHTING SYSTEM
- BMS